Senior Project Director Jacob Pieredes managed the construction of the North Shore Marine Transfer Station located in College Point, NY.
In all, approximately 3,800 linear feet of stainless spiral ducting was installed in various sizes from 10” to 62” with 1,400 feet sized at 52” and over 1,200 stainless steel Spiralmate connectors of all sizes were used to attach the ducting.